Christine Kim, vice president of Galaxy Research, said that Ethereum developers held the 140th All Core Developers Consensus Call (ACDC), the main contents of which include
Pectra Upgrade: Released the new consensus layer (CL) specification version v1.5.0-alpha.5 for the Pectra upgrade. The Geth client has generated some invalid blocks on Pectra Devnet 2 and is under investigation. The Erigon client has encountered problems connecting to the specification chain. The JSON RPC standardization of the execution layer (EL) client was discussed.
Pectra Devnet 3: Pectra Devnet 3 is planned to be launched in a week. EIP 2935 update, saving historical block hashes in the state, will be included in Devnet 3.
EIP 7251 Update: Discussed the update of EIP 7251 to solve the problem of effective balance calculation errors for slashing validators.
Beacon block body update: Discussed moving part of the request to execute the payload to a new field "ExecutionClientRequests" in the beacon block.
Engine API Updates: Proposals were made to simplify block transitions, and EIP 7685 will make it difficult for EL clients to distinguish block versions.
PeerDAS: PeerDAS Devnet 2 is planned to launch on August 23. Discussed EIP 7742, a way to update blob gas targets and maximums
The next CL upgrade will be named "Fulu", named after a star in the Cassiopeia constellation.