Antminer S19 XP dropped in a bid to swing crypto miners back into profit
Phil Harvey said that this type of miner can typically last a minimum of 36 months in a facility operated by their crypto firm Sabre56.

Phil Harvey said that this type of miner can typically last a minimum of 36 months in a facility operated by their crypto firm Sabre56.
Antminer announced on social media that ANTMINER E9 will go on sale at 9:00 am on July 6 (Eastern Time). According to the announcement, the E9 has a computing power of 2400M, a power consumption of 1920W, and an energy efficiency of 0.8J/M.